Wind power project

Brief Description:

Construction of a wind power plant. The planned project capacity is 50 MW with an expansion potential of up to 100–200 MW. The project is located in an area with highly favorable wind conditions (average wind speed of 8.79 m/s), ready access to infrastructure, motorways, and potential electricity consumers.

Country: Kazakhstan
Industry: Renewable energy (WPP / green energy)
Investment volume: TBC (To Be Confirmed)
Investor participation type: Strategic partnership / equity participation in project implementation
Project stage: Pre-investment stage; the project is prepared for further implementation:

Key Assets & Readiness

Land plot: 500 hectares (ha) allocated, with an option for expansion
Wind measurement: A wind mast has been installed, and long-term wind potential measurements have been completed
Data analysis: Independent analysis of wind data has been prepared by a European technical consultant
Technical studies: Preliminary engineering and technical studies have been developed

Financial Indicators

IRR: 19% (Equity IRR)
Payback period: ≈ 7–9 years (subject to confirmation following the final financial model)

Country: Kazakhstan

Industry: Renewable energy (WPP / green energy) / Renewable energy (Wind power / green energy)

Investor participation type: Strategic partnership / equity participation

Project stage: Pre-investment stage

Payback period: 7-9 years

Investment volume: TBC (To Be Confirmed)